Project Sankofa — Follow-Up Initiative (Operationalization & Productization)

Operationalize Sankofa climate & crop suitability evidence (P0-P4): heat/dry-spell farm protocols, BR-005 planting window auto-alerts, community engagement packs, Yam/Cashew strategy, and EIRAS/SiteSense commercial consultancy productization.

Owner: Chief of StaffClient: GAB Climate Smart Investments LtdStart: 10 Aug 2026End: 5 Oct 2026
Overall Progress8%

Initiative to Operations Spine

Trace the work from Portfolio justification through Project delivery and operational handover.

portfolio baGate G4standard governance

G0-G2

Portfolio & BA

approved for project

G3

Plan / baseline

Passed or pending

G4

Execute, monitor & control

Current gate

G5

Acceptance / release

Pending or passed

G6

Closure / benefits

Pending

Source initiative

Project Sankofa — Follow-Up Initiative

PSFU • promoted • G2

Proceed with Option A full 4-WP implementation.

Record Project Gate

Use for G3 baseline approval, G4 execution/control completion, G5 acceptance, and G6 closure or benefits review decisions.

Gate History

Portfolio G0-G2 and Project G3-G6 decisions in one view.

G0 — go

Portfolio & BA • Daniel Nsowah • 10 Aug 2026

G0 Intake passed. Initial concept and problem statement accepted into Portfolio & BA.

G1 — go

Portfolio & BA • Daniel Nsowah • 10 Aug 2026

G1 Business Case passed. Needs assessment and strategic fit validated.

G2 — go

Portfolio & BA • Daniel Nsowah • 10 Aug 2026

G2 Charter passed. Concept Note v1.0 approved under Option A (Full 4-WP Scope). Promoted to PM Project G3.

G3 — go

Project • Daniel Nsowah • 13 Aug 2026

CONDITIONAL GO. Phase 1 (R6 Heat & Dry-Spell Protocol, R7 BR-005 escalation wiring) is authorized to execute immediately — both are internal labour at zero cash cost. BLOCKING CONDITION ON PHASE 2: the two open cost lines — Twi translation and independent back-translation (9360fb91), and community engagement delivery covering printing, durbar contribution and radio airtime (602a9799) — must be priced and CEO-approved BEFORE Phase 2 opens on 2026-09-07. No community or institutional engagement spend may be committed until those lines carry approved figures. Both were deliberately left null at G3 rather than estimated from assumption, so this baseline carries no fabricated total. CARRIED SCOPE BOUNDARIES: (1) R3 Cashew pilot delivers a design and costed proposal only — planting is excluded from PSFU and returns through Portfolio & BA as its own budgeted initiative. (2) R9 EIRAS/SiteSense wiring is descoped by change request if the GEE terrain dependency is unresolved at the Phase 3 milestone (2026-09-21), rather than allowed to miss the 2026-10-05 end date silently. (3) Desktop-only provenance is maintained throughout with no new fieldwork or soil lab sampling, disclosed in every outward asset.

BA Documents Carried Forward

The pre-project logic that should govern delivery decisions.

No source BA documents available.

Transition to Operations

Define where the project output lives after delivery.

No operational handover recorded.

Requirements Traceability

No requirement trace links recorded.