GAB OS

EIRAS · Use Case 14

Assumptions & Evidence Validation Register

Every factual claim that feeds a client-facing EIRAS output — a law, a reporting obligation, a figure, a threshold, a methodology — is logged here with its source and verification status. The rule: nothing reaches a client as “fact” unless it is verified here and current. Built after the CLICOM fact-check found a ~45% citation error rate in agent-drafted content.

59 claim(s) not client-ready

These must be resolved before the relevant module ships to a client.

Show all not-client-ready claims
  • Needs re-checkUnder CBD COP decision 15/6, Ghana must submit its 7th National Report to the Convention on Biological Diversity by end February 2026, and u…reportbridge
  • UnverifiedCITES Annual Report field "Permits issued and refused" (C) is partial for CITES reporting. File held but not extracted. Source: Forestry Com…reportbridge
  • UnverifiedCITES Annual Report field "Legislative and administrative measures" (B) is partial for CITES reporting. File held but not extracted. Source:…reportbridge
  • UnverifiedCITES Annual Report field "Annual trade in CITES-listed species" (A) is partial for CITES reporting. File held but not extracted. Source: Fo…reportbridge
  • UnverifiedRamsar NR field "Wetland restoration and rehabilitation" (S4) is partial for Ramsar reporting. File held but not extracted. Source: Forestry…reportbridge
  • UnverifiedRamsar NR field "Community engagement and traditional knowledge" (S4) is partial for Ramsar reporting. File held but not extracted. Source: …reportbridge
  • UnverifiedRamsar NR field "Wise use policies and practices" (S4) is partial for Ramsar reporting. File held but not extracted. Source: Forestry Commis…reportbridge
  • UnverifiedRamsar NR field "Threats and pressures on Ramsar Sites" (S3) is partial for Ramsar reporting. File held but not extracted. Source: Forestry …reportbridge
  • UnverifiedRamsar NR field "Ecological character of Ramsar Sites" (S3) is partial for Ramsar reporting. File held but not extracted. Source: Forestry C…reportbridge
  • UnverifiedRamsar NR field "Ramsar Site designation status" (S2) is partial for Ramsar reporting. File held but not extracted. Source: Forestry Commiss…reportbridge

Register (4/145)

Filters: domain Efficiency; status all.

Clear filters
VerifiedEfficiencythresholdefficiency

Efficiency recommendations are advisory prompts based on footprint concentration, not automated commitments or guaranteed savings figures.

Source: EIRAS Efficiency Engine disclaimer, 2026-05-29 (2026-05-29) · verified 2026-05-29 · re-check by 2026-12-01

If wrong: Prevents over-reliance on rule-based recommendations as binding commitments.

Recommendations assert no savings figures, payback periods, or implementation costs without independent engineering review.

VerifiedEfficiencythresholdefficiency

Footprint entries linked to SiteSense cases represent screening-level estimates for project scoping, not audited corporate ESG disclosures.

Source: EIRAS Efficiency Engine scope limit, 2026-05-29 (2026-05-29) · verified 2026-05-29 · re-check by 2026-12-01

If wrong: Distinguishes project-scoping footprint estimates from audited corporate sustainability reports.

Site-level footprint entries should not be used as audited ESG disclosures without independent verification and corporate data collection.

VerifiedEfficiencymethodologyefficiency

Emission factors ship as reference values and start unverified. A footprint figure is only client-ready when the factor it was computed from is verified.

Source: EIRAS Efficiency Engine design v1, 2026-05-29 (2026-05-29) · verified 2026-05-29 · re-check by 2026-12-01

If wrong: Prevents unverified emission factors from being used in client-facing ESG reports.

Factors must be confirmed against primary sources (DEFRA/DESNZ, IGES/IEA, Ghana Energy Commission) before figures derived from them are marked client-ready.

VerifiedEfficiencythresholdefficiency

Scope 3 (value chain) emissions are not comprehensively covered by the current factor library. Claims about supply-chain or downstream emissions require specialist review.

Source: EIRAS Efficiency Engine sprint limit, 2026-05-29 (2026-05-29) · verified 2026-05-29 · re-check by 2026-12-01

If wrong: Prevents over-confident Scope 3 claims from a limited factor set.

The current factor library focuses on direct energy, fuel, water, and waste. Full Scope 3 coverage requires additional factors and methodologies.

Register a new assumption

← Back to EIRAS · Roadmap: docs/projects/2026-05-28_EIRAS-roadmap-use-cases-15-17-and-validation.md